Thursday, May 15, 2014

Terminal 3 rebirth

After having done a decent job on the cargo center (I thought so at least), I decided to revamp the original Terminal 3 I had built back in 2006. I took another MDF board and began laying out the ramp. I used the old terminal I had made of wood previously, yet another structure that needs to be converted to styrene one day. This board was a lot of fun to build, because I had personally taken measurements while working there. As of 2009 when I began constructing the new T3, I no longer worked at LAX. Excited about the new board, I began to conceptualize whether it would be possible to build the entirety of LAX in a modular format. Thus began my goal of building the entire airport to scale.
Shown here missing some ramp markings


Pushing AirTran out was part of my nightly job

No comments:

Post a Comment